AMP6 - CSO/Pumping Station

During AMP6 the team constructed & refurbished several pumping stations & Combined Sewer Overflows(CSO's). These included work on some key assets within the Welsh Water portfolio to ensure they performed as required to meet regulatory requirements. Survey information gathered & collated during both the CSO verification project & the Event Duration Monitoring (EDM) installation project informed the design teams and enabled tailored cost-effective solutions to be developed. A mixture of in-situ & off-site pre-packaged construction methods were used to optimise the construction phase.

AMP7 - CSO/Pumping Station

 

The work started in AMP6 will continue during AMP7, with a focus on reducing costs using innovation through the design & construction process

Additional Information

Northumberland Storyboard

Cambrian RainScape Storyboard

Halfway Houses Storyboard

Station Road Storyboard

Climate Change - Ganol Catchment

Northumberland - Halfway Case Study

Technical Questions? 

This event and website is designed and managed by Production 78 on behalf of Dwr Cymru Welsh Water.

Copyright © 2020 Production 78 Ltd. Production 78 is not responsible for the content of external sites